Engine wrapped.

July 3, 2017

I had the pleasure this morning of watching Dean performing some of his artistry with steel tube. He was working on the rear of the X1 chassis, hand notching tube, whilst accounting for tube rotation and bend calculations. Effortless and perfect.

Our goal was to wrap the Suzuki GSXR 1000 engine as tightly as possible in tube, while still allowing for engine extraction through the bottom of the chassis. I think we've done a nice job.

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Half-Time Mock-Up

April 10, 2018

1/2
Please reload

Recent Posts

April 10, 2018

January 16, 2018

November 6, 2017

July 9, 2017

July 3, 2017

June 21, 2017

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square